H₂ PCI projects
H2ercules Network West
Last updated: 30 September 2026
Provided information is based on the Hydrogen Core Network as approved on 22 October 2024 by the Federal Network Agency (Bundesnetzagentur). However, they are subject to review within the Network Development Plan (NDP) process.

Schematic representation of the pathway
H2ercules Network West connects the Belgian network to the German hydrogen core network. It links major consumption centers in the Rhineland, as well as other regions of Germany via adjacent H2ercules sections. Through the Belgian network, various hydrogen sources — such as terminals in the Antwerp and Zeebrugge areas — can be connected to the German hydrogen core network.
The H2ercules Belgium (222B) section forms the hydrogen pipeline system from the Eynatten border crossing on the German-Belgian border to the demand centers in the Rhineland near Weisweiler. This approximately 27-kilometer-long, newbuilt pipeline is scheduled to go into operation by 2028.
Fact sheet
approx. 27 km
Length
Aachen — Weisweiler
Route
2028
Comissioning
up to 91,2 GWh/d from BE to DE
Cross-border transmission capacity
in Progress
Status
Open Grid Europe GmbH
Pipeline operator