Legal publication

For full network transparency: Here you can find mandatory publications

Transparency is essential for all market participants. Therefore, OGE makes all statutory publications and regulatory information relating to natural gas available on this page in a centralised and easily accessible format. The content is organised by topic and can be viewed via the respective sections.

Sitemap on network transparency

3.1.2.a)

A detailed description of the capacity products, services and fees offered by Open Grid Europe can be found in the Capacity Products section and in the Contract Documents section.
T&Cs and Price Sheets
Capacity Products

.. b) u. c) 1.

Information on (transmission) contracts and other relevant documents can be found in this section.
VMS

.. c)

Information on the network code, as well as standard terms and conditions, can be found in our Terms & Conditions in the Contract Documents section.
T&Cs and Price Sheets

.. c) ii)

Information on the relevant gas quality parameters can be found in the Market Information section under web publications.
Web publications

.. c) iii)

The master data information can be found in the web publications.
Web publications

.. c) iv)

Information on the procedure for interruptible capacity can be found in our Terms & Conditions for Entry and Exit Contracts in the Contract Documents section.
T&Cs and Price Sheets

.. d)

Information on harmonised procedures to be applied when using the transmission system, including definition of key terms, can be found in the so-called Cooperation Agreement.
Cooperation Agreement

.. e)

Provisions on procedures for capacity allocation, congestion management, etc. can be found in our Terms & Conditions for Entry and Exit Contracts in the Contract Documents section.
T&Cs and Price Sheets

.. f)

Rules for capacity trading on the secondary market vis-à-vis transmission system operators can be found in our Terms & Conditions for Entry and Exit Contracts in the Contract Documents section and in the Cooperation Agreement.
Cooperation Agreement

.. i)

A detailed description of the gas network can be found via the master data in the web publications and network map (only in German) .
Web publications

.. j)

Information about the connection rules in our network.
Network Connection Rules

.. k)

Information on emergency mechanisms can be found in our Terms & Conditions for Entry and Exit Contracts in the Contract Documents section.
T&Cs and Price Sheets

.. l)

Agreed procedures at interconnection points (where relevant), nomination and matching procedures, other procedures for allocation and quantity deviations including the methods used can be found in the web publications and in the Contract Documents section.
T&Cs and Price Sheets

.. m)

Description of the methodology and process to calculate the technical capacity:

Market information natural gas/biogas / pdf / 226.84 KB

Methodology for the calculation of technically available capacity

in the transmission network operated by Open Grid Europe.

3.3 (1) a) - e), (4), (5)

Detailed updated information on capacities, nominations and renominations, actual load flows, calorific values, both historical/future and within-day network data on nominations and load flows in the network operated by Open Grid Europe can be found in the Market Information section under Operational Network Data in the web publications.
Web publications

.. (1) f) u. g)

Information on planned measures and maintenance work on the network can be found here.
Web publications

Updated information about the current status and the last interruptions can be found in the web publications.
Web publications

3.4 (1) u. (2)

Information on secondary trading can be found on the PRISMA website..
PRISMA

.. (5)

Information on the VTP, balancing actions and the status of the various gas grids that come together in the Trading Hub Europe market area can be found on website.
www.tradinghub.eu

.. (6)

Information on the daily fees for capacities can be found in our price tables and via the master data information in the web publications.
Web publications

Art. 33(4) of Regulation 2024/1789

You will also find here the list of relevant points according to Art. 33(4) of Regulation 2024/1789.

Publications according to EnWG

Publication of Fees according to Section 21 (3) EnWG

Publication (automated readout) of the currently valid charges can be found here.

Publication of structural data according to Section 23c (4) EnWG and of bookable points according to Section 23c (5) No. 1 EnWG

The structual data of OGE as well as lists of the relevant and bookable points are published here.

Publication of the dates of capacity auctions on the capacity booking platform (§ 23c (5) S. 1 No. 2 EnWG“)

The auction calendar is provided by ENTSOG once a year.

Publication of information on the proceeds of the marketing of capacities via an auction on the capacity booking platform (§ 23c (5) S. 1 No. 3 EnWG) 

The information is published by PRISMA.

Publication of information on the determination and calculation of the physical flow simulation and a documentation of capacity elevating measures carried out and their respective costs according to Section 23c (5) s. 1 No. 4 EnWG

The information on the determination and calculation of the physical flow simulation is contained in the network development plan according to Section 15a EnWG. The network development plan is published by FNB Gas. Furthermore the method for the calculation of technical capacity in the transmission grid of OGE is published here.

Capacity elevating measures include invitations for tender of flow commitments, capacities with allocation conditions as well as exclusion of single entry or exit points from free assignment. All information regarding the invitations for tender of flow commitments is published here. The products offered by the relevant TSO at the relevant point are published on the PRISMA capacity booking platform.

Information to be published before the annual yearly 

capacity auction and the tariff period

Publication by Open Grid Europe GmbH according to the network code on harmonised transmission tariff structures (Regulation (EU) 2017/460)

Here you can download all current publications. We are happy to answer any questions you may have.

Publication prior to the yearly capacity auction and the tariff period

Market information natural gas/biogas / pdf / 375.07 KB

Publication by Open Grid Europe GmbH according to the network code on harmonised transmission tariff structures

Art. 29 and 30 of Regulation (EU) 2017/460 (Network Code Tariffs)

Market information natural gas/biogas / xlsx / 27.73 KB

Annex to publication

according to Art. 30 (2) a) ii) und Art. 30 (2) b) Regulation (EU) 2017/460 (Network Code Tariffs)

Decision ‘MARGIT 2026‘ and 
‘MARGIT 2027‘

Market information natural gas/biogas / pdf / 431.96 KB

Ruling of the Federal Network Agency BK9-25/612

Decision ‘MARGIT 2027‘ of 06/05/2025

Market information natural gas/biogas / pdf / 400.11 KB

Ruling of the Federal Network Agency BK9-24/612

Decision ‘MARGIT 2026‘ of 22/05/2025 (only in German)

Market information natural gas/biogas / xlsx / 8.56 MB

Ruling of the Federal Network Agency BK9-18/612 – Methodolody to calculate the discounts

according chapter 5 of the decision ‘MARGIT’

Decision ‘BEATE‘

Market information natural gas/biogas / pdf / 254.63 KB

Ruling of the Federal Network Agency BK9-24/608

Decision ‘BEATE 2.1‘ of 28/08/2024 (only in German)

Market information natural gas/biogas / pdf / 436.51 KB

Ruling of the Federal Network Agency BK9-20/608 (only in German)

Decision ‘BEATE 2.0 of 16/10/2020‘

Market information natural gas/biogas / pdf / 508.00 KB

Ruling of the Federal Network Agency BK9-18/608

Decision ‘BEATE 2.0‘

REGENT Rulings

Market information natural gas/biogas / pdf / 1.65 MB

Ruling of the Federal Network Agency BK9-23/610

Decision ‘REGENT 2026‘

Market information natural gas/biogas / pdf / 2.78 MB

Ruling of the Federal Network Agency BK9-19/610

Decision ‘REGENT 2021

Market information natural gas/biogas / pdf / 9.63 MB

Ruling of the Federal Network Agency BK9-18/610-NCG

about the reference price methodology for the market area Net Connect Germany

Market information natural gas/biogas / pdf / 5.72 MB

Ruling of the Federal Network Agency BK9-18/611-GP

about the reference price methodology for the market area Gaspool

Information according to regulation (EU) 2024/1789


Here you can download all current publications. We are happy to answer any questions you may have.

Market information natural gas/biogas / pdf / 202.88 KB

Publication by Open Grid Europe GmbH of Information according to regulation (EU) 2024/1789

Information to be published prior tariff year 2026; Status 18 Dezember 2025

Market area

According to BNetzA-Decision BK7-23-043 concerning the approval of instruments to increase capacity (“ANIKA”) the TSOs shall publish the following information:

Publication according to tenor 6 lit. d) ANIKA 

The TSOs are obliged to publish a comprehensive process description of the market-based instruments (MBI) listed under tenor 3 lit. b) and the capacity buy-back listed under tenor 3 lit. c) by October 1, 2024.

The file “Process description MBI and capacity buy-back” (Acc. to tenor 6 lit. d) ANIKA (BK7-23-043)) can be downloaded from the website of Trading Hub Europe GmbH.

Market area merger

Publication according to BK7-19-037 (KAP+)

According to BNetzA-Decision BK7-19-037 concerning the approval of an oversubscription and buy-back scheme of the transmission system operators for the offer of additional capacity in the single German market area (“KAP+”) the TSOs shall publish the following information:

 

Publication according to tenor 3 lit. a) KAP+

According to tenor 3 lit. a) KAP+ from 25.03.2020 (BK7-19-037) BNetzA was informed on 28 April 2023 about the amount of additional capacity of all transmission system operators. Based on this, OGE provides a listing on its basic and additional capacities as a download. 

OGE emphasizes that this is the only capacity provided by OGE at the specific IPs and and not the VIP capacity provided across TSOs, if applicable.

Market information natural gas/biogas / pdf / 205.80 KB

IP-specific additional capacities

Gas Year 2023/2024


Publication according to tenor 3 lit. b) KAP+

According to tenor 3 lit. b) KAP+ the TSOs shall submit a joint report, evaluating the use of market-based instruments and the capacity buy-back in the previous gas year. The report was written by the market area manager THE and is published below.

Market information natural gas/biogas / pdf / 310.53 KB

Annual Monitoring Report pursuant to KAP+

According to tenor 3 lit. b) KAP+ (BK7-19-037)

Information on NC Interoperability

We would like to inform our network users about the following facts and therefore fulfill our information obligation regarding Art. 4.1, Commision Regulation (EU) 2015/703 of 30 April 2015 establishing a network code on interoperability and data exchange rules:

Rules for the matching process

Open Grid Europe GmbH applies on all relevant cross-border and market area interconnection points the so called „lesser-of rule“ when it comes to matching procedure (See here §13c, 2 of our General Terms & Conditions for Entry/Exit contracts (entry/exity system) currently in version 10.2, published on 10 October 2019)

Rules for the allocation of gas quantities

Open Grid Europe has established a so called Operational Balancing Agreement (OBA) or an equivalent procedure on all of its relevant cross-border and market area interconnection points which allows to allocate gas volumes to its network user on basis of their nomination (“allocated as nominated”). If the defined limits of the OBA are exhausted, then the adjacent transmission system operator may agree to extend those limits or otherwise to allocate quantities to network users proportionally based on the measured quantity (pro rata allocation). (See here §12 in Appendix 2 “Supplementary Terms and Conditions of Open Grid Europe GmbH” of our General Terms & Conditions for Entry/Exit contracts (entry/exity system) currently in version 10.2, published on 10 October 2019)

If there is an agreement between the adjacent transmission system operators about a change in procedure, than Open Grid Europe will inform about the start and stop of such a pro rata allocation by publishing a Urgent Market Message (UMM). 

Communication procedures in case of exceptional events

OIn the case of an exceptional event, Open Grid Europe GmbH will inform it network users if there is a potential impact on their confirmed quantities and provide all necessary information about the expected and actual end of the exceptional event by publishing an Urgent Market Message (UMM). Open Grid Europe GmbH publishes all UMMs on this website.
 

Price sheet, Network access natural gas/biogas / pdf / 536.89 KB

Network access conditions

General Terms & Conditions for Entry/Exit Contracts (entry/exit system) version 13.1 (12.08.2022), applicable from 1st October 2022

Storage data

Reaching storage — via our pipeline network

You can easily reach the storage facilities of many operators via the OGE network.

Storage operatorsStorage connection pointsStorage levels, injection and withdrawal quantities at the storage facilities connected to the OGE network:Available capacities of the storage facilities connected to the OGE network:
Friedeburger Speicherbetriebsgesellschaft mbH Crystal (ENBW-Share)Etzel (Speicher Crystal), Bitzenlander Weg 10https://www.crystal-storage.de/magnolia-public/Startpage/Reporting-ENBWhttps://www.crystal-storage.de/magnolia-public/Startpage/Reporting-ENBW
Friedeburger Speicherbetriebsgesellschaft mbH Crystal (EDF-Share)Etzel (Speicher Crystal), Bitzenlander Weg 10https://www.crystal-storage.de/magnolia-public/Startpage/Reporting-EDFhttps://www.crystal-storage.de/magnolia-public/Startpage/Reporting-EDF
Uniper Energy Storage GmbHEtzel (Speicher ESE),Bitzenlander Weg 3, Friedeburg-Etzel, Schienenstrang, EGL, Haiming 2 7F, Speicher Bierwang, Speicher Breitbrunn, Speicher Epe H, Speicher Epe Lhttps://storage-portal.uniper.energy/#/transparencyhttps://storage-portal.uniper.energy/#/transparency
Etzel-Kavernenbetriebsgesellschaft mbH & Co. KGFriedeburg-Etzel, Bitzenlander Weg 2http://www.ekb-storage.de/de/ekb-speicher/speichernutzung/http://www.ekb-storage.de/de/ekb-speicher/speicherkapazitaeten/
Trianel Gasspeichergesellschaft Epe mbH & Co. KGSpeicher Gronau-Epe H1https://www.trianel-gasspeicher.com/daten/bewegungsdaten/https://www.trianel-gasspeicher.com/produkte/speicherprodukte/
RWE Gasspeicher GmbHSpeicher Gronau-Epe H4https://portal.gasstorage-west.rwe.com/staende_und_fluessehttps://www.rwe-gasstorage-west.com/speicherkapazitaeten/
Nuon Epe Gasspeicher GmbHSpeicher Gronau-Epe L2https://agsi.gie.eu/#/historical/37X0000000000119/DEhttps://group.vattenfall.com/what-we-do/market-transparency/gas-storage
Sefe Storage GmbHSpeicher Haiming 3-Haidachhttps://www.sefe-storage.de/speicherdaten/bewegungsdatenhttps://www.sefe-storage.de/speicherdaten/bewegungsdaten
MND Gas Storage Germany GmbHZone MND GSGhttps://www.mnd-energystorage.de/betriebsinformationen/https://www.mnd-energystorage.de/buchbare-kapazitaten/